Aggie Square will be an innovation district unlike anything the university has ever taken on before – a place where university, industry, and community meet to create opportunities for everyone.
The Campus Security Management System (CSMS) provides unified security management using three major electronic security sub-systems: access control, building intrusion alarms, and video security.
As a result of the successful first phase of this project – completed in 2018 – the UC Davis Arboretum and Public Garden team secured a $5.4M grant to support the complete metamorphosis of this campus icon.
This project will create the first fully inclusive locker room space on campus. The work encompasses the demolition of the existing locker space and the creation of a new foot washing station, modern lockers and new private, accessible changing spaces and showers.
Student athletes will be able to practice with more flexibility thanks to outdoor lighting updates at the Dobbins Baseball complex and the Aggie Soccer Field.
Following the successful conversion of the Quad district, Big Shift construction is moving focus to the Sprocket District, which covers the western campus core including the Segundo and Reagan residence halls, the Student Health and Wellness Center, the ARC, the University Credit Union Center, and a handful of classroom and lab buildings.
A comprehensive program has been established to provide for demolition of beyond repair buildings throughout campus. Over 100 buildings have been identified for demolition. Many of these structures are older, small buildings in south and west campus or temporary buildings that have long outlived their temporary status.
In order to keep campus safe for the entire campus community and beyond, security infrastructure is being added, including the installation of new security cameras, call boxes and outdoor lighting.
The addition will include new research laboratories, a multi-disciplinary team laboratory, upper-division teaching laboratories, research laboratory support, office space for faculty and graduate student researchers and shared collaboration spaces.
Constructed in 2008, the Advanced Materials Research Laboratory now serves as the home of the UC Davis Coffee Center, the world’s first academic research and teaching facility entirely dedicated to the study of coffee.
Design and Construction Management is supporting Facilities Management on several deferred maintenance projects — on campus and beyond — including elevator repair, roof replacement and more.