Skip to main content
Design and Construction Management
UC Davis Logo
UC Davis Logo

Design and Construction Management

  • Intranet (DCM Staff Only)
  • CPMA
  • User Guides
  • Campus Design Guide
  • Current Projects | Interactive Map
  • Bidding Opportunities

Main navigation (extended config)

  • About
    • Org Charts
    • Leadership Team
    • Operating Units
      • Campus Planning
      • Capital Planning
      • Capital Projects
      • Contract Management
      • Space Management & Project Development
      • Engineering
      • Integrated Planning & Design
      • Real Estate Services
    • Staff Directory
      • Staff Profiles
      • Staff Awards
    • Job & Internship Opportunities
    • Contact Us
    • FAQs
  • Campus Community
    • Start a New Project
      • Project Initiation
      • Furniture Services
      • Space Release Program
      • Service Rates and Agreements
    • Explore Current Projects
      • Interactive Map
      • Featured Projects
      • Capital Project Reports
      • Construction Cameras
    • Big Shift
    • Seismic Safety
      • Seismic Improvement Projects
    • Security Investments
    • Road Closures
  • Designers
    • CPMA
    • Campus Design Guides
    • RFQs
  • Contractors
    • CPMA
    • RFQs
    • Bidding Opportunities
    • Awarded Contracts
    • Bid Opening Results
  • News
    • DCM News
    • Subscribe to Our Newsletter
    • Press Coverage
    • Capital Project Reports
    • Public Notices

Big Shift: Sprocket District Hot Water Conversion

Breadcrumb
  1. Home
  2. Featured Projects
  3. Big Shift: Sprocket District Hot Water Conversion
Big Shift trenching

See below

Design

0%

Construction

Summer 2027

Completion Date

TBD

Project Cost

About the Big Shift

UC Davis is undertaking a massive change to its heating infrastructure to shift away from fossil-fuels and toward renewable energy sources. Following the successful conversion of the Quad district, Big Shift construction is taking a huge step, installing a hot water heat recovery and storage system, which will immediately and significantly reduce the university's natural gas consumption. This phase of the Big Shift also includes the conversion of the Sprocket District, which covers the western campus core including the Segundo and Regan residence halls, the Student Health and Wellness Center, the ARC, the University Credit Union Center, and a handful of classroom and lab buildings. To facilitate this conversion, more hot water pipes will be installed and more building infrastructure will be updated. This phase of the project is broken up into four parts. Learn more and see project progress below.

Learn more about the Big Shift

  • Hot Water Distribution 
  • This part of the project encompasses the installation of new hot water pipes in the Sprocket District. See where pipes will be installed and get a more detailed look of project progress.

    Design Status100%
    Construction Status0%
    Completion DateAugust 2027
    Project Cost$37M 
  • Building Conversion
  • This part of the project encompasses the conversion of infrastructure of buildings within the Sprocket District. See progress broken down by building.

    Design Status85%
    Construction Status0%
    Completion DateDec. 2026
    Project Cost$25M
  • Hot Water Heat Recovery and Storage
  • This part of the project encompasses the installation of heat recovery chillers and a thermal energy storage tank.

    Design Status30%
    Construction Status0%
    Completion DateTBD
    Project Cost$55M
  • Wastewater Treatment Plant Demolition
  • This part of the project encompasses the demolition of an old, inactive wastewater treatment plant to make room for the hot water heat recovery and storage infrastructure. Through the demolition, below ground structures will be removed and the area will be infilled and leveled.

    Design Status50%
    Construction Status0%
    Completion DateTBD
    Project CostTBD

More information

Screenshot of the Big Shift interactive map

Big Shift Interactive Map

See completed, active and upcoming construction in this color-coded, interactive construction map

UC Davis Fossil Fuel-Free Pathway Plan Cover with UC Davis water tower and solar panels.

Fossil Fuel-Free Pathway Plan (FFFPP)

The Big Shift plays a major role in the university’s plan to move away from fossil fuels. Learn more about the FFFPP. 

Tags

Featured Projects Campus Facilities Management
❮  Previous Project
Next Project  ❯
Project Location
Check out the interactive map
Client
Campus, Facilities Management
Design Team
Hot Water Distribution, Building Conversion, Hot Water Heat Recovery and Storage: Affiliated Engineers (AEI)
Wastewater Treatment Plant Demolition: TBD
Contractor
Building Conversion: Peterson Mechanical, Inc.
Hot Water Distribution, Hot Water Heat Recovery and Storage, Wastewater Treatment Plant Demolition: TBD
Portrait Image
Dan G

Dan Golde

Position Title
  • Director
Portrait Image
Dylan F

Dylan Farver

Position Title
  • Project Manager
Portrait Image
Alan

Alan Suleiman

Position Title
  • Project Manager
Portrait Image
Roksana K

Roksana Kianian

Position Title
  • Associate Director
Site Logo

Contact Us

Address

255 Cousteau Place
Davis, California 95618

General Office Contact

Monday - Friday
8:00 A.M. - 4:30 P.M.
530-754-1111

Full Staff Directory

Email Us

Operational Units

Campus Planning

Capital Projects

Contract Management

Engineering

Integrated Planning & Design

Capital Planning

Space Management & Project Development

Real Estate Services

 

Partner Links

Finance, Operations and Administration

Arboretum and Public Garden

Facilities Management

Safety Services

Supply Chain Management

Office of Sustainability

 

UC Davis footer logo
This site is officially grown in SiteFarm.