Skip to main content
Design and Construction Management
UC Davis Logo
UC Davis Logo

Design and Construction Management

  • Intranet (DCM Staff Only)
  • CPMA
  • User Guides
  • Campus Design Guide
  • Current Projects | Interactive Map
  • Bidding Opportunities

Main navigation (extended config)

  • About
    • Org Charts
    • Leadership Team
    • Operating Units
      • Campus Planning
      • Capital Planning
      • Capital Projects
      • Contract Management
      • Space Management & Project Development
      • Engineering
      • Integrated Planning & Design
      • Real Estate Services
    • Staff Directory
      • Staff Profiles
      • Staff Awards
    • Job & Internship Opportunities
    • Contact Us
    • FAQs
  • Campus Community
    • Start a New Project
      • Project Initiation
      • Furniture Services
      • Space Release Program
      • Service Rates and Agreements
    • Explore Current Projects
      • Interactive Map
      • Featured Projects
      • Capital Project Reports
      • Construction Cameras
    • Big Shift
    • Seismic Safety
      • Seismic Improvement Projects
    • Security Investments
    • Road Closures
  • Designers
    • CPMA
    • Campus Design Guides
    • RFQs
  • Contractors
    • CPMA
    • RFQs
    • Bidding Opportunities
    • Awarded Contracts
    • Bid Opening Results
  • News
    • DCM News
    • Subscribe to Our Newsletter
    • Press Coverage
    • Capital Project Reports
    • Public Notices

Campus Outdoor Lighting & Security

Breadcrumb
  1. Home
  2. Featured Projects
  3. Campus Outdoor Lighting & Security
Emergency Call Box along a walking path on the UC Davis campus

See below

Design

See below

Construction

Summer 2025

Completion

$7.1M

Project Cost

About this Project

To enhance campus safety for all community members and visitors, UC Davis is upgrading security infrastructure with additional cameras, emergency call boxes, and outdoor lighting. Seven new emergency call boxes—providing instant connection to 911 dispatchers—will be installed on the Vet Med campus and along bike paths. Additionally, 11 new security cameras will be placed in key locations, including intersections along La Rue Road, Hutchison Drive, Old Davis Road, and near select Egghead sculptures. Lastly, seven areas will receive new groups of outdoor lights along pedestrian pathways to improve visibility and safety.

  • Emergency Call Box Progress
  • Location
    Status
    Completion
    Sprocket BikewayConstruction8/2025
    Soccer Bikeway at Mann LabConstruction8/2025
    Physical Sciences Mall near the Silo SouthConstruction8/2025
    Hutchison Drive at Bioletti WayConstruction8/2025
    Dairy Road at Dairy BikewayConstruction8/2025
    Pritchard Veterinary Medicine Teaching HospitalConstruction8/2025
    Tupper HallConstruction8/2025
  • Security Camera Progress
  • Location
    Status
    Completion
    "Eye on Mrak," north of Mrak HallInstalled5/2024
    "See No Evil, Hear No Evil," Mrak Hall CircleInstalled5/2024
    "Stargazer," North HallConstruction8/2025
    Garrod Drive at Environmental Services LaneConstruction8/2025
    Garrod Drive at La Rue RoadConstruction8/2025
    Hutchison Drive Roundabout at West VillageConstruction8/2025
    Hutchison Drive at Health Sciences DriveConstruction8/2025
    La Rue Road at Hutchison DriveConstruction8/2025
    La Rue Road at Segundo Services AdministrationInstalled3/2025
    Old Davis Road at Hutchison DriveConstruction8/2025
    South Gate at Old Davis RoadConstruction8/2025
  • Outdoor Lighting Progress 
  • Location
    Status
    Completion
    Cushing Way from Hutchison Drive to Lot 6Bidding12/2025
    Olson Hall Bike Parking and East Quad BikewayBidding12/2025
    Peter J Shields Avenue from California Avenue to A StreetBidding12/2025
    South Core Campus Neighborhood near the Art Building, Music Building, Wright Hall walkways and the plaza between School of Education and Olson HallBidding12/2025
    Hutchison Drive from Bioletti Way to the Teaching & Learning ComplexBidding12/2025
    Lot 25 South Pedestrian Pathway along Dobbins Field and the Aggie Soccer FieldBidding12/2025
    Sprocket Bikeway from California Avenue to the Housing Admin Building roundaboutBidding12/2025

Learn more about ongoing security improvements

More information

outdoor light, blue light emergency call box, AggieAccess credentials on a smartphone

UC Davis Invests in Additional Security Improvements

Read more about the $20 million campus investment made toward improving campus security in the next five years

Tags

Featured Projects UC Davis Police Department Engineering
❮  Previous Project
Next Project  ❯
Client
UC Davis Police Department
Design Team
Catalyst Security Consulting, Edge Electrical Consulting, Cunningham Civil Engineering, Bevier Structural Engineering
Contractor
TBD
Portrait Image
Roksana K

Roksana Kianian

Position Title
  • Associate Director
Site Logo

Contact Us

Address

255 Cousteau Place
Davis, California 95618

General Office Contact

Monday - Friday
8:00 A.M. - 4:30 P.M.
530-754-1111

Full Staff Directory

Email Us

Operational Units

Campus Planning

Capital Projects

Contract Management

Engineering

Integrated Planning & Design

Capital Planning

Space Management & Project Development

Real Estate Services

 

Partner Links

Finance, Operations and Administration

Arboretum and Public Garden

Facilities Management

Safety Services

Supply Chain Management

Office of Sustainability

 

UC Davis footer logo
This site is officially grown in SiteFarm.