Skip to main content
Design and Construction Management
UC Davis Logo
UC Davis Logo
Design and Construction Management
  • Intranet (DCM Staff Only)
  • CPMA
  • User Guides
  • Campus Design Guide
  • Current Projects | Interactive Map
  • Bidding Opportunities
Main navigation (extended config)
  • About
    • Org Charts
    • Leadership Team
    • Operating Units
      • Campus Planning
      • Capital Projects
      • Contract Management
      • Engineering
      • Integrated Planning & Design
      • Real Estate Services
    • Staff Directory
      • Staff Profiles
      • Staff Awards
    • Job & Internship Opportunities
    • Contact Us
    • FAQs
  • Project Information
    • Start a New Project
      • Project Initiation
      • Furniture Services
      • Service Rates and Agreements
    • Explore Current Projects
      • Interactive Map
      • Construction Cameras
    • Road Closures
    • Big Shift
    • Security Investments
    • Seismic Safety
      • Seismic Improvement Projects
  • Campus Community
    • Space Services
    • FacilitiesLink
    • Home Loan Programs
  • Designers
    • CPMA
    • Campus Design Guides
    • RFQs
  • Contractors
    • CPMA
    • RFQs
    • Bidding Opportunities
    • Awarded Contracts
    • Bid Opening Results
  • News
    • DCM News
    • Subscribe to Our Newsletter
    • Press Coverage
    • Events

Bodega Marine Laboratory North Wing Repairs

Breadcrumb
  1. Home
  2. Featured Projects
  3. Bodega Marine Laboratory North Wing Repairs
Bodega Marine Lab North Wing

100%

Design

100%

Construction

Summer 2026

Completion Date

$1.9M

Project Cost

About this Project

After decades of being exposed to rain, moisture and wind-blown fog, the Bodega Marine Laboratory (BML) North Wing is undergoing exterior and interior repairs. Originally built in 1977, the North Wing houses offices, research labs and wet labs that facilitate BML’s impactful coastal research. The repairs include replacing corroded portions of the exterior wall, installing new floors along the perimeter of the building, painting some impacted offices and putting in new cabinets and sinks. The project also includes improvements to mechanical, electrical, and plumbing systems.

Tags

Featured Projects Facilities Management
❮  Previous Project
Next Project  ❯
Project Location
Bodega Marine Laboratory
Client
Bodega Marine Lab – Office of Research
Design Team
MAD Architecture
Contractor
Staples Construction
Portrait Image
Stephanie Burke

Stephanie Burke

Position Title
  • Project Manager
Site Logo

Contact Us

Address

255 Cousteau Place
Davis, California 95618

General Office Contact

Monday: 9:00 am to 2:00 pm
Tu - Thu: 8:00 am - 5:00 pm
Friday: Message service only.

530-754-1111

Full Staff Directory

Email Us

Operational Units

Campus Planning

Capital Projects

Contract Management

Engineering

Integrated Planning & Design

Real Estate Services

 

Partner Links

Finance, Operations and Administration

Arboretum and Public Garden

Facilities Management

Safety Services

Supply Chain Management

Office of Sustainability

 

UC Davis footer logo
This site is officially grown in SiteFarm.