Skip to main content
Design and Construction Management
UC Davis Logo
UC Davis Logo

Design and Construction Management

  • Intranet (DCM Staff Only)
  • CPMA
  • User Guides
  • Campus Design Guide
  • Current Projects | Interactive Map
  • Bidding Opportunities

Main navigation (extended config)

  • About
    • Org Charts
    • Leadership Team
    • Operating Units
      • Campus Planning
      • Capital Planning
      • Capital Projects
      • Contract Management
      • Space Management & Project Development
      • Engineering
      • Integrated Planning & Design
      • Real Estate Services
    • Staff Directory
      • Staff Profiles
      • Staff Awards
    • Job & Internship Opportunities
    • Contact Us
    • FAQs
  • Campus Community
    • Start a New Project
      • Project Initiation
      • Furniture Services
      • Space Release Program
      • Service Rates and Agreements
    • Explore Current Projects
      • Interactive Map
      • Featured Projects
      • Capital Project Reports
      • Construction Cameras
    • Big Shift
    • Seismic Safety
      • Seismic Improvement Projects
    • Security Investments
    • Road Closures
  • Designers
    • CPMA
    • Campus Design Guides
    • RFQs
  • Contractors
    • CPMA
    • RFQs
    • Bidding Opportunities
    • Awarded Contracts
    • Bid Opening Results
  • News
    • DCM News
    • Subscribe to Our Newsletter
    • Press Coverage
    • Capital Project Reports
    • Public Notices

Baseball & Soccer Facility Lighting

Breadcrumb
  1. Home
  2. Featured Projects
  3. Baseball & Soccer Facility Lighting
Two soccer players playing on a field at UC Davis

100%

Design

100%

Construction

Winter 2025

Completion

$4.4M

Project Cost

About this Project

Student athletes will be able to practice with more flexibility thanks to outdoor lighting updates at the Dobbins Baseball complex and the Aggie Soccer Field. Eight 80-foot poles will be installed at the baseball field and four 100-foot poles will be added to the soccer field to provide each with NCAA competition level lighting. The updated lighting will allow student athletes to maximize field use around extreme heat and other weather conditions and allow coaches to schedule away from peak academic hours. The new lights are equipped with light shields and use the latest LED technology to limit light spillage beyond the perimeter of the facilities. 

Tags

Featured Projects Intercollegiate Athletics Special Projects Group
❮  Previous Project
Next Project  ❯
Project Location
Dobbins Baseball Complex and Aggie Soccer Field
Client
Athletics
Design Team
Robert Ty Hoblitt
Contractor
Staples Construction
Portrait Image
portrait of Matt Blankenheim

Matt Blankenheim

Position Title
  • Associate Director
Site Logo

Contact Us

Address

255 Cousteau Place
Davis, California 95618

General Office Contact

Monday - Friday
8:00 A.M. - 4:30 P.M.
530-754-1111

Full Staff Directory

Email Us

Operational Units

Campus Planning

Capital Projects

Contract Management

Engineering

Integrated Planning & Design

Capital Planning

Space Management & Project Development

Real Estate Services

 

Partner Links

Finance, Operations and Administration

Arboretum and Public Garden

Facilities Management

Safety Services

Supply Chain Management

Office of Sustainability

 

UC Davis footer logo
This site is officially grown in SiteFarm.