100%
Design
100%
Construction
Fall 2024
Completion
$2.6M
Project Cost
About this Project
In order to support growing Campus Recreation programs and their participants, lighting has been added to Russell Field to expand the time the field space can be used. 10 state-of-the-art LED lights were added to the perimeter of the field to provide recreational level lighting. A lighting study was conducted to ensure minimal light spillage past the field.
Project Location | Russell Field |
Client | Student Affairs |
Design Team | Cunningham Engineering/ M. Nells Engineering, Inc |
Contractor | Shane Brown Electric |