100%
Design
Bidding
Construction
Spring 2025
Completion Date
$1.3M
Project Cost
About this Project
This project consists of structural upgrades to the Fire and Police Building. Seismic work includes adding concrete beams at exterior perimeter roof and wall to floor connections at interior office hallways. Also included are deferred maintenance work and accessibility code work at the entrance, restrooms, parking lots and pathways.
Learn more about ongoing and completed seismic projects and UC seismic policy.
Project Location | Fire & Police Building |
Client | Campus |
Design Team | Blackbird Architects and Buehler Structural Engineering |
Contractor | TBD |