Design
Varies by Group
Construction
Varies by Group
Completion
Varies by Group
$5M
Project Cost
About this Project
Design and Construction Management developed a comprehensive program to demolish 100 buildings identified as “beyond repair.” Many of these structures are older, small buildings in south and west campus or temporary buildings that have long outlived their temporary status. Work includes safe removal of hazardous materials; removal and reuse of materials where possible; proper disconnection and capping of utilities; demolition and disposal of structures; and site restoration.
- Progress details
Group Status Completion Date Group 1 Design: 100% complete; Construction: 100% complete Fall 2023 Group 2 Design: 100% complete; Construction: 0% complete TBD Group 3 Design: 100% complete; Construction: 0% complete Winter 2025 Group 4 Design: 10% complete, Construction: 0% complete TBD - Group 1 Buildings
- Animal Husbandry Feed Lab
Animal Physiology Chronic Acceleration Research Unit Animal Bldg
Headhouse 2&3
Hopkin's Cold Storage
Poultry House R
Poultry House Q
Trailer J-11 - Group 2 Buildings
- TB 179
TB 181
TB 182
Univ. Extension Trailer A
Univ. Extension Trailer B
Univ. Extension Trailer C
Univ. Extension Trailer D - Group 3 Buildings
- HC1
HE1
HE1 Garage
Poultry House G and N
Reproductive Biology Trailer North (TRN)
Reproductive Biology Trailer South (TRS)
TB 2 & 3
TB007
TB159
TB160
Client | Campus |
Design Team | DCM |
Contractor | Group 1 - Resource Environmental Groups 3 - AFM Environmental Groups 2,4 - TBD |