Skip to main content
Design and Construction Management
UC Davis Logo
UC Davis Logo

Design and Construction Management

  • Intranet (DCM Staff Only)
  • CPMA
  • User Guides
  • Campus Design Guide
  • Current Projects | Interactive Map
  • Bidding Opportunities

Main navigation (extended config)

  • About
    • Org Charts
    • Leadership Team
    • Operating Units
      • Campus Planning
      • Capital Planning
      • Capital Projects
      • Contract Management
      • Space Management & Project Development
      • Engineering
      • Integrated Planning & Design
      • Real Estate Services
    • Staff Directory
      • Staff Profiles
      • Staff Awards
    • Job & Internship Opportunities
    • Contact Us
    • FAQs
  • Campus Community
    • Start a New Project
      • Project Initiation
      • Furniture Services
      • Space Release Program
      • Service Rates and Agreements
    • Explore Current Projects
      • Interactive Map
      • Featured Projects
      • Capital Project Reports
      • Construction Cameras
    • Big Shift
    • Seismic Safety
      • Seismic Improvement Projects
    • Security Investments
    • Road Closures
  • Designers
    • CPMA
    • Campus Design Guides
    • RFQs
  • Contractors
    • CPMA
    • RFQs
    • Bidding Opportunities
    • Awarded Contracts
    • Bid Opening Results
  • News
    • DCM News
    • Subscribe to Our Newsletter
    • Press Coverage
    • Capital Project Reports
    • Public Notices

Jungerman Hall Seismic Improvements

Breadcrumb
  1. Home
  2. Campus Community
  3. Seismic Improvement Projects
  4. Jungerman Hall Seismic Improvements
Jungerman Hall

100%

Design

95%

Construction

Winter 2025

Completion

$11M

Project Cost

  • No active updates at this time as of 5/6

 

About this Project

Project Overview

Construction Timeframe: Spring 2024 - Winter 2025

Seismic Improvements: Seismic strengthening with objective of meeting Seismic Performance Level IV

Code Compliance: Updated fire sprinkler and fire alarm system, new accessible parking, pathway and entry way improvements, remodeled restrooms and locker room.

Electrical Panel Improvements: Replacement of select electrical panels

Jungerman Hall has been identified as a high priority, level VI rated, building for seismic improvements. 

Seismic Renovation

The following scope will improve seismic safety while minimizing the impact to the interior of the building. 

  • Improve building strength in north-south direction with new buttress wall
  • Improve building strength in east-west direction by filling in select clerestory windows

Fire, Accessibility & Other Code Improvements

The following scope will be executed in compliance with the National Fire Protection Association standards (NFPA), the California Building Code (CBC) and Americans with Disabilities Act Standards (ADA).

  • Provide new automatic fire sprinkler and upgrade existing partial sprinkler system in the basement
  • Select upgrades to the existing fire alarm system
  • Install an accessible parking stall
  • Update primary entrance door
  • Install new concrete sidewalk and curb
  • Update interior room signage
  • Remodel existing restrooms and locker room

Electrical Panel Replacements

Electrical panels that have reached end of life will be replaced to help support electrical needs throughout the building. When possible, this work may be completed on a separate timeline from the other project work to help alleviate outages during business hours.  

Learn more about seismic safety at UC Davis

See other seismic improvement projects

Contact the seismic team

Tags

Seismic Improvement Projects Featured Projects
❮  Previous Project
Next Project  ❯
Project Location
Jungerman Hall
Client
Campus, College of Letters and Science
Design Team
Harley Ellis Devereaux Corporation
Contractor
S.J. Amoroso Construction
Portrait Image
Sandra Mott

Sandra Farrell Mott

Position Title
  • Associate Director
Site Logo

Contact Us

Address

255 Cousteau Place
Davis, California 95618

General Office Contact

Monday - Friday
8:00 A.M. - 4:30 P.M.
530-754-1111

Full Staff Directory

Email Us

Operational Units

Campus Planning

Capital Projects

Contract Management

Engineering

Integrated Planning & Design

Capital Planning

Space Management & Project Development

Real Estate Services

 

Partner Links

Finance, Operations and Administration

Arboretum and Public Garden

Facilities Management

Safety Services

Supply Chain Management

Office of Sustainability

 

UC Davis footer logo
This site is officially grown in SiteFarm.