Electrical Substation Transformer Addition

About this Project

To improve electrical power reliability, provide capacity for growth, allow for operational flexibility and minimize the impact of major power outages, our campus is adding a new transformer to the electrical substation. This project will provide a new 30 MVA transformer “H” with associated switchgears and capacitor bank at the campus electrical substation and install a new 18-way duct bank to transport bulk power from the substation to the S2 switch station.