The UC Davis Campus Design Guide (CDG) manual is written to provide a list of preferred and required products as well as mandatory design constraints for all construction on the UC Davis campus. These criteria are provided to aid the design professional in the development of a successful project and to meet the requirements of the University. This document is not aimed to replace the work of the design professional or their best judgment, nor is it to be taken verbatim as a contract specification. The goal is to ensure that the campus is provided with functional and long-lasting buildings based on experience with existing campus buildings and with maintenance issues that have been encountered.
- I Administrative
- 01 Introduction 14
02 Table of Contents 14
03 Administrative Requirements 14 - II Design Requirements
- Part II Design Requirements 14
- III Construction Divisions
- DIV 02 Existing Conditions 14
DIV 03 Concrete 14
DIV 04 Masonry 14
DIV 05 Metals 14
DIV 06 Wood Plastics and Composites 14
DIV 07 Thermal and Moisture Protection 14
DIV 08 Openings 14
DIV 09 Finishes 14
DIV 10 Specialties 14
DIV 11 Equipment 14
DIV 12 Furnishings 14
DIV 13 Special Construction 14
DIV 14 Conveying Equipment 14
DIV 21 Fire Suppression 14
DIV 22 Plumbing 14
DIV 23 HVAC 14
DIV 26 Electrical 14
Div 27 Communications 14
DIV 28 Electronic Safety and Security 14
DIV 31 Earthwork 14
DIV 32 Exterior Improvements 14
DIV 33 Utilities 14
- IV Standard Specifications
Division 1
00 SpecCover
0 Specifications Table of Contents 3-13
01 11 00 Summary Work 3-13
01 12 00 Multiple Contract Summary 3-13
01 14 00 Work Restrictions 1-7-14
01 21 00 Allowances 3-13
01 22 00 Unit Prices 3-13
01 23 00 Alternates 3-13
01 23 00 ValueAnalysis DESIGN BUILD 3-13
01 25 00 Substitution Procedures 3-13
01 26 13 Requests Information Procedures 3-13
01 29 00 Payment Procedures DESIGN BUILD 3-13
01 31 13 Project Coordination 3-13
01 31 19 Project Meetings 3-13
01 32 00 Construction Progress Doc OVER 1M 05 07
01 32 00 Construction Progress Doc UNDER 1M 3-13
01 33 23 Shop Drawings Product Data Samples 3-13
01 35 13 Special Project Procedures PRIMATE CENTER 3-13
01 35 16 Alteration Project Procedures 3-13
01 35 43 Environmental Procedures 3-13
01 35 53 Security Procedures 3-13
01 41 00 Regulatory Requirements 7-13
01 42 00 References 3-13
01 43 00 Quality Assurance 3-13
01 43 39 Mock-Ups 3-13 OPTIONAL
01 45 00 Quality Controls 3-13 OPTIONAL
01 51 00 Temporary Utilities 6-13
01 52 00 Construction Facilities 3-13
01 54 00 Construction Aids 3-13
01 55 00 Vehicular Access and Parking 6-13
01 56 00 Temporary Barriers Enclosures 3-13
01 56 39 Tree Plant Protection 3-13
01 57 23A Storm Water Pollution Prevention 14 Greaterthan1acre
01 57 23B Storm Water Pollution Prevention 14 Lessthan1acre
01 58 00 Project Identification 3-13
01 60 00 Product Requirements 3-13
01 71 23 Field Engineering 3-13
01 71 33 Protection Adjacent Construction 3-13
01 73 23 Bracing Anchoring 3-13
01 73 29 Cutting Patching 3-13
01 74 00 Cleaning Waste Management 3-13
01 77 00 Closeout Procedures 3-13
01 78 00 Close-out Submittals 3-13
01 78 39 Project Record Documents 3-13
01 79 00 Demonstration Training 3-13
01 81 19 Indoor Air Quality Requirements 3-13
01 91 00 Commissioning 3-13
50 List of Drawings 3-13
Technical Specs
02 41 13 Selective Site Demolition 10
02 41 19 Selective Structure Demolition 10
2 82 00 Asbestos REV 2-13
02 83 00 Lead Remediation REV 2-13
02 85 00 Mold Clean-Up 10
06 16 43 Gypsum Sheathing 12
07 25 00 Water Resistive Barrier System 12
09 22 36.23 Cement Plaster Lathing and Lath Accessories 12
09 24 00 Portland Cement Plastering 12
13 21 00 Controlled Environ Rms13
14 20 00 Elevators 13
22 08 00 Commissioning Plumbing 10
23 08 00 Commissioning HVAC 14
25 08 00 Commissioning of DDC EMS Systems 12
25 95 00 EMS General Requirements 12
25 95 05 Lab Airflow Control 14
25 95 30 DDC EMS Hardware 12
25 95 50 DDC EMS Software 12
26 08 00 Commissioning Electrical Systems 10
28 08 00 Commissioning Electronic Safety Security 10
28 31 00 Fire Detection Alarm 14
32 84 00 Irrigation 14
32 90 00 Planting 14
3 05 13 Manholes and Structures 10
33 05 26 Utility Line Signs 10
33 08 00 Commissioning of Utilities 10
33 08 10 Commissioning of Water Utilities 10
33 08 30 Commissioning of Sewer Utilities 10
33 11 00 Water Utility Distribution Piping 10
33 12 13 Backflow Preventers 10
33 12 16 Water Distribution Valves 10
33 12 19 Fire Hydrants 10
33 12 33 Water Utility Metering 10
33 13 00 Disinfection of Domestic Water Piping 10
33 31 00 Sanitary Utility Sewarage Piping 10
33 39 23 Sanitary Utility Sewerage Cleanout 10
33 51 13 Natural Gas Piping 10
- V Drawings
A-01 Recycling Cabinet Details 13
A-02 Door Operator 14
C-01 Sidewalk Details 14
C-02 Concrete Paving12
C-03 Area Drain 14
C-04 Permanent Metal Bollard12
C-05 Removable Steel Bollard 14
C-06 Removable Wood Bollard12
C-07 Trench-Single Utilit12y
C-08 Trench-Double Utility Horizontal12
C-09 Trench-Double Utility Vertical12
C-10 Pressure Pipe Over Structure12
C-11 Pressure Pipe Lowering12
C-12 Asbestos Cement Pipe Undercrossing12
C-13 Thrust Block Horizontal12
C-14 Thrust Block Vertical12
C-15 Manhole12
C-16 Manhole Cover12
C-17 Inside Drop12
C-18 Service Lateral & Cleanout12
C-19 Grease Interceptor12
C-20 Drain Inlet12
C-21 Oil-Sand Separator12
C-22 Bicycle Ramps 14
E-01 Transformer12
E-02 Transformer Pad12
E-03 Building Electrical Meter & Utility Meter Diagram 13
E-04 Building Electrical Meter Ion7550 13
E-05 Duct Bank Cross Section12
E-06 Grounding12
E-07 Entry Through Footings12
E-08 Light Pole Base12
E-09 Manhole & Cable Rack Station12
F-01 Hydrant 12
F-02 Double Check Valve Assembly - FW Service12
G-01 Utilities Painting Standards 13
L-01 Irrigation Shut Off Valve12
L-02 Vavle Box Installation12
L-03 Sleeve Under Pavement 14
L-04 Irrigation Control System Schematic12
L-05 Irrigation Controller12
L-06 Irrigation Control Detail12
L-07 Irrigation Control Antenna Detail12
L-08 Flow Sensor Installation 13
L-09 Trenching Detail12
L-10 Irrigation Wire Connection12
L-11 Irrigation Gate Valve RCV's 14
L-12 Irrigation Remote Control Valve 14
L-13 Pop-Up Sprinkler12
L-14 Sprinkler on a Slope12
L-15 Deep Root Watering System 14
L-16 Quick Coupling Valve12
L-17a Subsurface Drip System Layout
L-17b Drip Line to PVC Connection Point
L-17c Air Relief Valve
L-17d Flush Valve
L-17e RCV Drip Assembly
L-18a Tree Irrigation
L-18b Typical Tree Planting (Double Stake) 14
L-19 Shrub Planting Typical12
L-20 Planting Triangular Spacing Detail12
L-21 Vine Planting Detail12
L-22 Ground Cover Planting12
L-23 Sod Lawn Detail12
L-24 Concrete Mowband - Plain12
L-25 Concrete Mowband - UCD Standard12
L-26 Decomposed Granite with Redwood Header12
M-01 Typical Ultrasonic Flow Meter12
M-02 Typical Insertion Flow Meter12
M-03 Air Release12
M-04 Steam Vault Typical Layout12
M-05 Steam Vault Electrical12
M-06 High Pressure Steam Trap Set 13
M-07 Condensate Cooler in Steam Vault 13
M-08 Steam Pressure Reducing Station12
M-09 Typical Steam Meter12
M-10 Typical Condensate Meter12
P-01 Water Valve and Valve Box12
P-02 Tee Connection @ Main12
P-03 Water Meter 2in or Less12
P-04 4-inch Water Service 14
P-05 Reduced Pressure Backflow Preventer 2in or Smaller - DW Service12
P-06 Reduced Pressure Backflow Preventer 3in and Larger - DW Service12
P-07 Valve and Valve Box12
P-08 Typical Gas Service - Diaphragm Meter12
P-09 Typical Gas Service - Rotary Meter12
Q-01 Typical Environmental Room - (No Defrost)12
Q-02 Typical Environmental Room - (Requiring Defrost)12
- VI Appendices
- Appendix A - Abbreviations & Definitions 10
Appendix B - Student Housing 13
Appendix C - Animal Facilities 14
Appendix D - Biological Safety Labs 13
Appendix E - Trash Enclosures 10
- VII Related Standards
- UC Davis Sign Program 14
Please direct Questions and Comments related to Campus Design Guide to your Project Manager